We perform:
- Development of process design documentation on metallurgical profile (pyrometallurgy, hydrometallurgy, including electrolysis, rolling) for industrial metallurgy enterprises of heavy nonferrous metals;
- Engineering of manufactures for hot galvanizing of fabricated metal products;
- Development of process design documentation for objects and manufactures of ferrous metallurgy (electric furnace steel smelting manufactures, secondary steel treatment, continuous steel casting, secondary ferrous metals treatment);
- Reviewing research-and-development works dealing with engineering and construction of ferrous and nonferrous metallurgy objects and preparation of comments and summaries on research-and-development works;
- Construction designer supervision.
References on construction and modernization of copper enterprises:
- New copper tankhouse with a capacity of 450 thous. tons of cathodes per year, electrolytic copper foil shop, copper powders shop, modernization of a copper smelting shop at JSC “Uralelectromed”;
- Electrolytic copper refining shop at SP “Pankom-Yun”;
- Smelter, copper tank house, copper wire rod shop at CJSC “Novgorod metallurgical plant”;
- copper wire rod production at JSC “Uralelectromed”, SP “Katur-Invest”;
- copper wire rod production at JSC “Kamkabel”;
- electrolytic copper foil shop, copper tank house, anode production area modernization with a MAERZ furnace installation at JSC “Kyshtym Electrolytic Copper Plant”;
- Automated process line of annealing the band from copper alloys by “Otto Yunker” (Germany) at JSC “Kirov Non-Ferrous Metals Processing Plant”
- Technical upgrading of gas treatment and gas duct system of a copper smelting shop at Mednogorsk Copper – Sulphur Combine, LLC.
- Scaled-up investment valuation on creation of anode production areas at copper smelting productions of enterprises.

References on construction and modernization of zinc enterprises:
- LLC “Uralzinc” plant with a capacity of 140 thous. tons of zinc pig per annum.
- Hot galvanizing shop with a capacity of 50 thous. tons per year at JSC “Uralelectromed”;
- Modernization and technical upgrading o facilities at JSC “Electrozinc”;
- Modernization and technical upgrading o facilities at JSC “Chelyabinsk zinc plant”.
References on construction and modernization of lead enterprises:
- Feasibility study on reconstruction of Biysky oleum plant to process lead containing raw materials in the Ausmelt furnace;
- Secondary lead processing shop at CJSC PO “Tsvetmetservice”.
References on construction and modernization of ferrous metallurgy enterprises:
- Modernization of facilities at “Metallurgical plant named after A.K. Serov;
- Modernization of electric smelting complex DSP-120 at JSC “Ashinsky metallurgical plant”;
- Modernization of electric smelting complex for cast pipe shells at JSC “Pervouralsk New Pipe plant”
- Modernization of electric smelting shop at JSC “NSMMZ”;
- Scaled-up feasibility study for construction of a metallurgical complex based on iron ore deposits such as “Taezhnoye”, “Desovskoye”, “Gorkitskoye”, “Tarynakhskoye”;
- Construction of a technological complex for the III indurating machine of a pelletizing plant at JSC “Mikhailovsky GOK”;
- Scaled-up feasibility study for modernization of nonferrous metals plants (JSC "Revda Non-Ferrous Metals Processing Works", CJSC “Kolchugtsvetmet).