Project activities



“Uralmekhanobr” performs an integrated design and projects support starting from a technology development up to reaching design performance.

During 82 years of design activities, the institute performed projects on construction and modernization of 174 huge industrial objects:

  • 15 underground mines and pits;
  • 19 plants (including 16 metallurgical);
  • 147 crushing and screening, concentrating, pelletizing, sintering plants.

The technical archive of the institute accounts to 2 001549 storage units. In total the institute designed 1489 facilities for industrial applications and industrial infrastructure.

Engineering Manager

Package of engineering services at all stages of an investment project :

  • conceptual engineering
  • basic engineering
  • detailed engineering
  • designer's supervision of construction
  • precommissioning and achievement of design parameters.

JSC Uralmekhanobr operates in 20 constituent entities of the Russian Federation, participates in the realization of large-scale projects in the territory of Russia, CIS countries & far-abroad countries, e.g.:

  • completed design and working documentation on the construction of a new (one of the most advanced in the world) copper electrolysis shop for OJSC “Uralelectromed” with a capacity of 450 thous. tons of cathodes per year (Sverdlovsk Region, Russia);
  • executes working documentation on reconstruction of the underground mine of OJSC “Gaysky GOK” (mining and processing integrated works) with an increase of annual productivity up to 7 mln. tons of ore per annum (Orenburg Region, Russia);
  • executes working documentation on construction of a process complex of a new generation induration machine of the Pelletizing plant for OJSC “Mikhaylovsky GOK” with 5 mln. tons capacity of iron-ore pellets per annum;
  • executes working documentation on construction of a first stage of the Kimkano-Sutarsky GOK with 10 mln. tons capacity of ore per year;
  • develops feasibility study on construction of a Pelletizing plant with 5 mln. tons capacity per annum in frameworks of  construction of a hot iron briquetting plant for Sokolovo-Sarbaisky ore-dressing production association” (Kazakhstan Republic);
  • develops technical and economic assessment on construction of GOK and metallurgical complex at the titanium magnetites deposit of “Tebinbulak” (Uzbekistan Republic);
  • performs a conceptual engineering of ore-dressing & metallurgical complexes at “Tebinbulak” deposit ” (Uzbekistan Republic);
  • participates in reconstruction and new construction of ore-dressing facilities at Verkhne-Kamskoe deposit of potassium salts (JSC “UralKali”, CJSC “Verkhnekamsk Potash Company”).